Precautions for installing wire rope

Author: Edit: Source: Date of issue: 2022.09.07
Abstract:
Precautions for installing wire ropes

  Replacing elevator wire ropes is a relatively complex and high-intensity labor work involving many safety factors. In order to work safely and efficiently and avoid safety accidents, reasonable and scientific management and construction are required.

  Attention should be paid to the construction site:

  1. High-altitude workers must wear safety helmets, safety belts, and personal protective equipment. Those who are not physically fit are strictly prohibited from working in this position.

  2. Obvious warning signs must be set up on the construction site, and if public places are involved, guardrails must be set up to block irrelevant personnel from entering, so as to prevent non-workers from entering the construction site at will and avoid accidental injuries.

  3. Each post needs to wear a walkie-talkie. During the operation, it is necessary to ensure clear calls and clear instructions.

  4. During the construction process, personnel must obey the operation instructions of the only engineering guidance. No one may issue operation instructions at will, nor work in violation of the instructions issued by the engineering guidance without authorization, so as to ensure the effectiveness of the response mechanism.

  Construction site survey and tool preparation:

  1. The construction personnel shall conduct on-site survey on the elevator shaft, corridor, floor station and machine room in advance to prevent injury from falling, falling, electric shock and being involved in equipment.

  2. Ensure sufficient lighting in the machine room, well, and corridor.

  3. There are no obstacles in the active parts of the operation.

  4. The platform formed in the machine room should have protective bars.

  5. The rotating running parts should have a safe distance from the active position of the operation.

  6. The equipment wiring in the computer room should be standardized and safe.

The content of this website is organized, edited and published by the editor of East China Steel Rope. If you reprint, please bring the title and link of this article. Huadong Steel Rope appreciates your support. We will continue to provide brand wire rope products and high-quality technical guidance services. Huadong Steel Rope appreciates your company!



Title: Precautions for installing wire rope link:http://www.zsrope.com/42/188

Information
Foshan Zhongsheng Company continues to provide technical service work on steel wire ropes for port machinery at Taizhou Power Plant

Foshan Zhongsheng Company continues to provide technical service work on steel wire ropes for port machinery at Taizhou Power Plant

2017.7.15. Foshan Zhongsheng Company continues to provide technical service work on steel wire ropes for port machinery at Taizhou Power Plant
2021-07-20
Foshan Zhongsheng Company provided pre-sales technical services for steel wire ropes for port machinery for the Changzhou Power Plant of Guoneng Group

Foshan Zhongsheng Company provided pre-sales technical services for steel wire ropes for port machinery for the Changzhou Power Plant of Guoneng Group

2021.7.16. A three-person team from Foshan Zhongsheng Company and Fasten Metal Products Co., Ltd. provided pre-sales technical services for steel wire ropes for port machinery at the Changzhou Power Plant of Guoneng Group.
2021-07-20

hotline

13809800053